What is Big Bang Adoption ?
Big Bang Adoption is a instant changeover, where user switch old system into fully
functioning new system in a given date. At the point when a new
system needs to be implemented in an association. User adopt new system. There are three
different way to adopt.
Big Bang adoption
Phased Adoption
Parallel Adoption
In parallel adoption the old and the new
system are running parallel, so every one of the clients can become accustomed
to the new system, and in the interim do their work utilizing the old system. Phased
adoption means the adoption will happen in many phases, so after each stage the
system is a little closer to be completely received. In big bang adoption, the user
switch between utilizing the old system to utilizing the new system generated at
one single date, the alleged moment changeover of the system
When an association
choose to utilize the big bang adoption, and supports the progressions which
are required for this, the genuine changing procedure are begin. This procedure
includes a few stages: converting the
system, releasing parts of the system and training the future users.
Converting
the system:
At initial, Planning
for the entire adoption process is required. Making a planning enables future
clients to realize what will occur and when they ought to anticipate certain
changes, which keeps away from superfluous vulnerabilities and subsequently
makes a superior working environment. The planning clarifies when the real adoption
happens and offers the future clients to get ready for this change. The picture
below demonstrate the activities of controlling the system
After making
planning. The old data form is converted into new form which work in new
system. This data loaded into new system which called loaded-data. Now the
loaded data need to be check, whether the productivity of data is good and to
test the understanding level of the future user. Offline trial is executed to
check the system and user can work together. Now, it came to check the validity
verification, if the data is not valid it need to change again and the
association have to prepare a different way of execution.
Releasing
parts of the system –
If all the
data is valid, separate parts of the system can be released. The database which
is changed from the old database should be released, so the new information is
available. Next, the procedure application should be released, so the new
application can be used. The foundation of the entirely different system should
be released, to clear how the system will look like and how everything is
associated. Important thing to note is that in this stage just separate parts
are release, which don't shape the new system. Note that all this process is
happens offline, only the system developers can this, the user still working on
old system. The model above shows what activities should be executed by the system
controller, to get the results that lead to the release parts. If the releasing
part is failed, the administration need to decide new changes once again.
Training
the future users -
If the
releasing part is succeeded, next step to prepare the user. Now, all user need
to train in working with the new system. The human resources department select
the experienced staffs, who can take the responsibility of work so that there
would be no delay in work.